I 495 NB over HWY S BOLTON RD

1.75 MI S OF ST-117 · County 027, Massachusetts · Built 1963 · 3 Lanes · 47,667 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
B150041V2DOTNBI
Year Built
1963
Length
37 m (121.4 ft)
Max Span
14.3 m
Width
17.4 m (57.1 ft)
Lanes
3
Daily Traffic
47,667
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,180,000
Total Project Cost
$6,271,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.