HWY SUGAR RD over I 495

MM 71.5 / 1.5 MI N OF 117 · County 027, Massachusetts · Built 1963 · 2 Lanes · 400 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
B1500321ADOTNBI
Year Built
1963
Length
95.7 m (314 ft)
Max Span
23.8 m
Width
12.5 m (41 ft)
Lanes
2
Daily Traffic
400
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$7,791,000
Total Project Cost
$11,687,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.