ST117 MAIN ST over WATER STILL RIVER

.1 MI E LANCASTER TWN LN · County 027, Massachusetts · Built 1937 · 2 Lanes · 16,803 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Serious
Deck
7
Good
Superstructure
5
Fair
Substructure
3
Serious

Bridge Details

Structure #
B15001206DOTNBI
Year Built
1937
Reconstructed
1952
Length
31.7 m (104 ft)
Max Span
12.2 m
Width
10.2 m (33.5 ft)
Lanes
2
Daily Traffic
16,803
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,122,000
Total Project Cost
$3,184,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.