HWY MILL ST over WATER NASHUA RIVER

.2 MI. WEST OF ST. 110 · County 027, Massachusetts · Built 1996 · 2 Lanes · 5,800 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
L02005AE0MUNNBI
Year Built
1996
Length
32 m (105 ft)
Max Span
30 m
Width
10.5 m (34.4 ft)
Lanes
2
Daily Traffic
5,800
Material
Prestressed Concrete
Design
Box Beam or Girders - Single or Spread
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$2,828,000
Total Project Cost
$4,243,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.