I 495 SB over RR BMRR (ABANDONED)

0.1 MI N OF ST-62 · County 027, Massachusetts · Built 1963 · 3 Lanes · 27,582 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
B090181V1DOTNBI
Year Built
1963
Length
13.4 m (44 ft)
Max Span
11.9 m
Width
17.4 m (57.1 ft)
Lanes
3
Daily Traffic
27,582
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,582,000
Total Project Cost
$2,374,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.