HWY ELM ST over WATER MILL RIVER

1 M SE OF BLACKSTONE ST · County 027, Massachusetts · Built 1880 · 2 Lanes · 1,900 vehicles/day

Overall
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
B130201EEMUNNBI
Year Built
1880
Length
13.1 m (43 ft)
Max Span
3.7 m
Width
8.2 m (26.9 ft)
Lanes
2
Daily Traffic
1,900
Material
Masonry
Design
Arch - Deck
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$746,000
Total Project Cost
$1,120,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.