HWY SUMMER ST over WATER MILL RIVER

.1 MI W OF ELM ST · County 027, Massachusetts · Built 1955 · 2 Lanes · 4,857 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
B130121EDMUNNBI
Year Built
1955
Length
14.3 m (46.9 ft)
Max Span
13 m
Width
10.5 m (34.4 ft)
Lanes
2
Daily Traffic
4,857
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$1,023,000
Total Project Cost
$1,535,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.