HWY WRENTHAM RD over WATER PETERS RIVER
1000 FT E OF PULASKI BLVD · County 021, Massachusetts · Built 1954 · 2 Lanes · 4,800 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
42.025542, -71.486489
This bridge is in worse condition than 29.2% of bridges in County 021. The average bridge in Massachusetts is 0 years old; this one is 72 years old.
Nearby Bridges
HWY PAINE ST over WATER PETERS RIVER
Built 1967
ST126 S MAIN ST over TR PEDESTRIAN PATH
Built 2015
WOOD AV over PETERS RIVER
Built 1900
MILL ST over PETERS RIVER
Built 1930
ELM ST/CMBRLND RD over PETERS RIVER
Built 1963
PRIVILEGE ST over MILL RIVER
Built 1961
RI 114 DMND HLL RD over PETERS RIVER
Built 1926
SOCIAL/CLINTON STS over MILL RIVER CONDUIT
Built 1962
EAST SCHOOL ST over MILL RIVER
Built 1964
RI 122 HAMLET AVE over BLACKSTONE RIVER
Built 1959
Bridge Details
- Structure #
- B060062A1MUNNBI
- Year Built
- 1954
- Length
- 12.2 m (40 ft)
- Max Span
- 11.3 m
- Width
- 15.2 m (49.9 ft)
- Lanes
- 2
- Daily Traffic
- 4,800
- Material
- Concrete
- Design
- Tee Beam
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,283,000
- Total Project Cost
- $1,925,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.