HWY S MAIN ST over WATER BUMPS RIVER

AT BUMPS RIVER · County 001, Massachusetts · Built 1957 · 2 Lanes · 7,091 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
B0100141FMUNNBI
Year Built
1957
Length
42.4 m (139.1 ft)
Max Span
6.1 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
7,091
Material
Concrete Continuous
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$3,657,000
Total Project Cost
$5,486,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.