I 295 SB over I 95

4.5 MI EAST OF RI LINE · County 005, Massachusetts · Built 1967 · 1 Lanes · 6,816 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
A160613UGDOTNBI
Year Built
1967
Length
94 m (308.4 ft)
Max Span
34.2 m
Width
17.7 m (58.1 ft)
Lanes
1
Daily Traffic
6,816
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,184,000
Total Project Cost
$3,277,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.