I 295 NB over I 95

I-295 AT I-95 · County 005, Massachusetts · Built 1967 · 1 Lanes · 14,695 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
A160613UFDOTNBI
Year Built
1967
Length
92 m (301.8 ft)
Max Span
34.4 m
Width
17.7 m (58.1 ft)
Lanes
1
Daily Traffic
14,695
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,138,000
Total Project Cost
$3,208,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.