I 295 NB over HWY CLIFTON ST

.3 MI W OF I 95 · County 005, Massachusetts · Built 1967 · 2 Lanes · 19,351 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
A160593UJDOTNBI
Year Built
1967
Length
33.1 m (108.6 ft)
Max Span
16 m
Width
17.7 m (58.1 ft)
Lanes
2
Daily Traffic
19,351
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,876,000
Total Project Cost
$2,815,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.