ST 28 S MAIN ST over ST125 ANDOVER BYPASS
3.8 MI S ANDOVER CENTER · County 009, Massachusetts · Built 1958 · 4 Lanes · 17,700 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
42.605469, -71.122347
This bridge is in worse condition than 17.7% of bridges in County 009. The average bridge in Massachusetts is 0 years old; this one is 68 years old.
Nearby Bridges
ST 28 MAIN ST over WATER MARTINS BROOK
Built 1903
ST125 BALLRDVLE ST over I 93
Built 1958
HWY ANDOVER ST over WATER SHAWSHEEN RIVER
Built 1900
I 93 NB over RR MBTA/BMRR
Built 1959
I 93 SB over RR MBTA/BMRR
Built 1959
ST 62 MIDDLESEX AV over I 93
Built 1958
HWY TEWKSBURY ST over RR CSX
Built 1980
HWY CHESTNUT ST over WATER IPSWICH RIVER
Built 1967
I 93 NB over WATER SHAWSHEEN RIVER
Built 1958
I 93 SB over WATER SHAWSHEEN RIVER
Built 1958
Bridge Details
- Structure #
- A090382YPDOTNBI
- Year Built
- 1958
- Reconstructed
- 2012
- Length
- 55.5 m (182.1 ft)
- Max Span
- 25.8 m
- Width
- 28.2 m (92.5 ft)
- Lanes
- 4
- Daily Traffic
- 17,700
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,051,000
- Total Project Cost
- $3,077,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.