HWY SLOCUM ST over WATER ACUSHNET RIVER

200 FT E OF RIV RD N BEDF · County 005, Massachusetts · Built 2002 · 2 Lanes · 6,846 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
A03001AVMMUNNBI
Year Built
2002
Length
59.8 m (196.2 ft)
Max Span
20 m
Width
16.3 m (53.5 ft)
Lanes
2
Daily Traffic
6,846
Material
Prestressed Concrete
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$3,646,000
Total Project Cost
$5,470,000