HWY MT PLSNT ST over ST140

1.3 MI NE OF I 195 · County 005, Massachusetts · Built 1970 · 4 Lanes · 11,285 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Condition Ratings

ComponentRatingDescription
Deck 5 Fair
Superstructure 6 Satisfactory
Substructure 6 Satisfactory

Location

41.665808, -70.943172

This bridge is in worse condition than 58.7% of bridges in County 005. The average bridge in Massachusetts is 0 years old; this one is 56 years old.

Nearby Bridges

Bridge Details

Structure #
N060343NEDOTNBI
Year Built
1970
Length
70.7 m (232 ft)
Max Span
35.7 m
Width
20.4 m (66.9 ft)
Lanes
4
Daily Traffic
11,285
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$9,404,000
Total Project Cost
$14,107,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.