HWY HAYWARD RD over ST 2

0.25 MI W OF RT 27 · County 017, Massachusetts · Built 1950 · 2 Lanes · 5,301 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
A02036294DOTNBI
Year Built
1950
Reconstructed
1990
Length
46.9 m (153.9 ft)
Max Span
14.7 m
Width
13.3 m (43.6 ft)
Lanes
2
Daily Traffic
5,301
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,059,000
Total Project Cost
$6,089,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.