ST 27 MAIN ST over RR MBTA/BMRR

100 FT S OF SCHOOL ST · County 017, Massachusetts · Built 1906 · 3 Lanes · 9,069 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
A0200429ADOT634
Year Built
1906
Reconstructed
1997
Length
26 m (85.3 ft)
Max Span
13.1 m
Width
15.2 m (49.9 ft)
Lanes
3
Daily Traffic
9,069
Material
Prestressed Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,114,000
Total Project Cost
$4,672,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.