HWY RIVER ST over WATER FORT POND BROOK

@ CORNER OF CARRIAGE ST · County 017, Massachusetts · Built 1937 · 2 Lanes · 800 vehicles/day

Overall
Fair
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
A02008255MUNNBI
Year Built
1937
Length
15.8 m (51.8 ft)
Max Span
7 m
Width
7.6 m (24.9 ft)
Lanes
2
Daily Traffic
800
Material
Steel
Design
Arch - Deck
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$1,496,000
Total Project Cost
$2,245,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.