HWY MARTIN ST over WATER FORT POND BROOK

0.2 MI S. OF CENTRAL ST. · County 017, Massachusetts · Built 1965 · 2 Lanes · 4,267 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
A0202325BMUNNBI
Year Built
1965
Length
6.4 m (21 ft)
Max Span
2.7 m
Lanes
2
Daily Traffic
4,267
Material
Steel
Design
Culvert
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$586,000
Total Project Cost
$880,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.