BUCKNAM RD over I295 NB & SB-from plans

0.3 MI WLY OF JCT US1 · County 005, Maine · Built 2022 · 2 Lanes · 14,010 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
5830
Year Built
2022
Length
73.8 m (242.1 ft)
Max Span
37.8 m
Width
15.9 m (52.2 ft)
Lanes
2
Daily Traffic
14,010
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.