ALLEN AVE EXT. over PRESUMPSCOT RIVER

0.7 MI N OF PORTLAND · County 005, Maine · Built 1995 · 2 Lanes · 6,420 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
5669
Year Built
1995
Length
106.8 m (350.4 ft)
Max Span
54.9 m
Width
11.6 m (38.1 ft)
Lanes
2
Daily Traffic
6,420
Material
Concrete
Design
Arch - Deck
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.