I 295 NB over PRESUMPSCOT RIVER

1.0 MI N OF PORTLAND TL · County 005, Maine · Built 1960 · 2 Lanes · 27,010 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
5828
Year Built
1960
Reconstructed
1990
Length
83.6 m (274.3 ft)
Max Span
33.5 m
Width
10.7 m (35.1 ft)
Lanes
2
Daily Traffic
27,010
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.