I-75 over ORCHARD ROAD

.25 MI. NE JCT US 25 OP · County 117, Kentucky · Built 1999 · 3 Lanes · 77,163 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
059B00100R
Year Built
1999
Length
46.3 m (151.9 ft)
Max Span
17.7 m
Width
24.1 m (79.1 ft)
Lanes
3
Daily Traffic
77,163
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.