I-75 over RIVARD DR IN FT WRIGHT

NBL .75 MI NE OF US 25 OP · County 117, Kentucky · Built 1960 · 4 Lanes · 77,163 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
059B00043R
Year Built
1960
Reconstructed
1998
Length
48.5 m (159.1 ft)
Max Span
15.2 m
Width
21.3 m (69.9 ft)
Lanes
4
Daily Traffic
77,163
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$90,000
Total Project Cost
$90,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.