I-75 NC over BEECHWOOD ROAD
.25 MI N JCT KY 371 · County 117, Kentucky · Built 1993 · 5 Lanes · 73,820 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
39.050869, -84.5681
This bridge is in worse condition than 14.8% of bridges in County 117. The average bridge in Kentucky is 0 years old; this one is 33 years old.
Nearby Bridges
I-75 over BEECHWOOD ROAD
Built 1993
BUTTERMILK PIKE over NS (CNO&TP) SYSTEM
Built 1965
BUTTERMILK PIKE over I-75 @ 186.347
Built 1994
KY-2373 over PLEASANT RUN CREEK
Built 2022
DIXIE HIGHWAY over I-75 @ 187.72
Built 1999
I-75 over NS (CNO&TP) SYSTEM
Built 1993
KY-2373 over PLEASANT RUN CREEK
Built 1960
I-75 over KY 2373 (CRESCENT SP. RD
Built 1993
I-75 over ORCHARD ROAD
Built 1999
I-75 NC over ORCHARD ROAD
Built 1999
Bridge Details
- Structure #
- 059B00096L
- Year Built
- 1993
- Length
- 49.7 m (163.1 ft)
- Max Span
- 16.5 m
- Width
- 25.7 m (84.3 ft)
- Lanes
- 5
- Daily Traffic
- 73,820
- Material
- Prestressed Concrete Continuous
- Design
- Box Beam or Girders - Single or Spread
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,716,000
- Total Project Cost
- $1,715,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.