BUTTERMILK PIKE over I-75 @ 186.347

1.1 MI.NW JCT US 25-42 · County 117, Kentucky · Built 1994 · 5 Lanes · 34,722 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
059B00097N
Year Built
1994
Length
59.4 m (194.9 ft)
Max Span
29.6 m
Width
24.7 m (81 ft)
Lanes
5
Daily Traffic
34,722
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.