COUNTY ROAD over BRANCH PANTHER CREEK

079282702 · County 049, Iowa · Built 1948 · 2 Lanes · 62 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000131770
Year Built
1948
Reconstructed
2004
Length
8.2 m (26.9 ft)
Max Span
7.6 m
Width
5.5 m (18 ft)
Lanes
2
Daily Traffic
62
Material
Wood or Timber
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$300,000
Total Project Cost
$350,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.