COUNTY ROAD over BRANCH PANTHER CREEK

079280903 · County 049, Iowa · Built 1925 · 2 Lanes · 21 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000131710
Year Built
1925
Reconstructed
1993
Length
6.7 m (22 ft)
Max Span
6.1 m
Width
9.7 m (31.8 ft)
Lanes
2
Daily Traffic
21
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$200,000
Total Project Cost
$220,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.