270TH ST over PANTHER CREEK

079282201 · County 049, Iowa · Built 2023 · 2 Lanes · 60 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
000000000131751
Year Built
2023
Length
31.4 m (103 ft)
Max Span
11.9 m
Width
10.1 m (33.1 ft)
Lanes
2
Daily Traffic
60
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$900,000
Total Project Cost
$950,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.