I-65 SB SBL RAMP over CENTRAL AVENUE

02.52 N I-70 · County 097, Indiana · Built 2023 · 4 Lanes · 53,313 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
080844
Year Built
2023
Length
26.8 m (87.9 ft)
Max Span
26.3 m
Width
25.6 m (84 ft)
Lanes
4
Daily Traffic
53,313
Material
Prestressed Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.