I-65 NBL Ramp from over I-65 NBL Mainline Ramp
02.12 N I-70 · County 097, Indiana · Built 2023 · 2 Lanes · 31,350 vehicles/day
Overall
Deck
8
Very Good
Superstructure
9
Excellent
Substructure
9
Excellent
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 9 | Excellent |
| Substructure | 9 | Excellent |
Location
39.783919, -86.142869
This bridge is in worse condition than 20.5% of bridges in County 097. The average bridge in Indiana is 0 years old; this one is 3 years old.
Nearby Bridges
I-65 NB over I-70 WB & I-70 WB CD Ram
Built 2023
I-65 SB to I-70 EB over COLLEGE AVE./5-RAMPS
Built 2022
I-65 SB over I-70 WB & I-70 WB-CD
Built 2023
I-65 NB over COLLEGE AVENUE
Built 2023
I-65 NB ramp from over COLLEGE AVENUE
Built 2023
I-65 SB & CD over COLLEGE AVENUE
Built 2023
I-70 EB Ramp from over I-65 NB Mainline Ramp
Built 2023
I-70 EB over LEWIS STR MONON TRAIL
Built 2022
I-65 SB to I-70 EB over LEWIS STR MONON TRAIL
Built 2023
I-70 WB & CD over LEWIS ST & MONON TRAIL
Built 2023
Bridge Details
- Structure #
- 080922
- Year Built
- 2023
- Length
- 42.8 m (140.4 ft)
- Max Span
- 40.8 m
- Width
- 13.7 m (44.9 ft)
- Lanes
- 2
- Daily Traffic
- 31,350
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.