I-65 NB over COLLEGE AVENUE

02.26 N I-70 · County 097, Indiana · Built 2023 · 3 Lanes · 34,480 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
080906
Year Built
2023
Length
39.1 m (128.3 ft)
Max Span
38.2 m
Width
19.3 m (63.3 ft)
Lanes
3
Daily Traffic
34,480
Material
Prestressed Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.