E 4TH ST;MUNI#7300 over BRANCH POND CR

FAIRFIELD · County 191, Illinois · Built 2010 · 2 Lanes · 325 vehicles/day

Overall
Good
Culvert
8
Very Good

Bridge Details

Structure #
096601200000000
Year Built
2010
Length
9.8 m (32.2 ft)
Max Span
8.2 m
Lanes
2
Daily Traffic
325
Material
Concrete
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.