SE 4TH STREET over POND CREEK

FAIRFIELD · County 191, Illinois · Built 1990 · 2 Lanes · 500 vehicles/day

Overall
Good
Culvert
8
Very Good

Bridge Details

Structure #
096600800000000
Year Built
1990
Length
8 m (26.2 ft)
Max Span
3.9 m
Lanes
2
Daily Traffic
500
Material
Concrete
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.