FAP-823 (ILL-15) over POND CREEK

1.5 MI E FAIRFIELD · County 191, Illinois · Built 1984 · 2 Lanes · 3,900 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
7
Good

Bridge Details

Structure #
096006400000000
Year Built
1984
Reconstructed
2024
Length
22.4 m (73.5 ft)
Max Span
10.3 m
Width
10.4 m (34.1 ft)
Lanes
2
Daily Traffic
3,900
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$315,000
Total Project Cost
$367,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.