FAI-55 RAMPS &FR R over TRIB TO SILVER CREEK
N OF NEW DOUGLAS RD · County 119, Illinois · Built 1970 · 4 Lanes · 28,800 vehicles/day
Overall
Culvert
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 6 | Satisfactory |
Location
38.969319, -89.751242
This bridge is in worse condition than 54.2% of bridges in County 119. The average bridge in Illinois is 0 years old; this one is 56 years old.
Nearby Bridges
FAS777-LVNGSTN-ND over FAI 55
Built 1974
FAI 55 FR#1709 over STREAM
Built 1973
FAS 777 NEW DOUGLA over TRIB. TO SILVER CRK
Built 2002
SPANGLER RD/CITY S over TRIB TO SILVER CK
Built 1973
I-55 SB over UPRR
Built 1973
I-55 W Frontage Rd over UPRR
Built 1939
I-55 NB over UPRR
Built 1973
OLD HILLSBORO/ TR over TRIB TO SILVER CK
Built 1901
ALHAMBRA RD (FAS77 over I-55 & E FRONTAGE RD
Built 1973
LIBBRA RD/TR 67 over TRIB TO SILVER CK
Built 1974
Bridge Details
- Structure #
- 060201600000000
- Year Built
- 1970
- Length
- 7.1 m (23.3 ft)
- Max Span
- 3.2 m
- Lanes
- 4
- Daily Traffic
- 28,800
- Material
- Concrete Continuous
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.