FAS 777 NEW DOUGLA over TRIB. TO SILVER CRK
.6 MI EAST OF I-55 · County 119, Illinois · Built 2002 · 2 Lanes · 1,700 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 8 | Very Good |
Location
38.968447, -89.7413
This bridge is in worse condition than 29.8% of bridges in County 119. The average bridge in Illinois is 0 years old; this one is 24 years old.
Nearby Bridges
OLD HILLSBORO/ TR over TRIB TO SILVER CK
Built 1901
FAI 55 FR#1709 over STREAM
Built 1973
FAI-55 RAMPS &FR R over TRIB TO SILVER CREEK
Built 1970
FAS777-LVNGSTN-ND over FAI 55
Built 1974
I-55 SB over UPRR
Built 1973
I-55 NB over UPRR
Built 1973
I-55 W Frontage Rd over UPRR
Built 1939
SPANGLER RD/CITY S over TRIB TO SILVER CK
Built 1973
LIBBRA RD/TR 67 over TRIB TO SILVER CK
Built 1974
New Douglas Rd over SILVER CREEK
Built 1991
Bridge Details
- Structure #
- 060023500000000
- Year Built
- 2002
- Length
- 28.8 m (94.5 ft)
- Max Span
- 28.2 m
- Width
- 13.2 m (43.3 ft)
- Lanes
- 2
- Daily Traffic
- 1,700
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.