I-55 W Frontage Rd over UPRR
N OF NEW DOUGLAS RD · County 119, Illinois · Built 1939 · 2 Lanes · 150 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
38.977969, -89.749947
This bridge is in worse condition than 54.2% of bridges in County 119. The average bridge in Illinois is 0 years old; this one is 87 years old.
Nearby Bridges
I-55 NB over UPRR
Built 1973
I-55 SB over UPRR
Built 1973
SPANGLER RD/CITY S over TRIB TO SILVER CK
Built 1973
FAI-55 RAMPS &FR R over TRIB TO SILVER CREEK
Built 1970
OLD HILLSBORO/ TR over TRIB TO SILVER CK
Built 1901
FAS777-LVNGSTN-ND over FAI 55
Built 1974
FAS 777 NEW DOUGLA over TRIB. TO SILVER CRK
Built 2002
FAI 55 FR#1709 over STREAM
Built 1973
TR 288 over CONRAIL RR
Built 1901
ALHAMBRA RD (FAS77 over I-55 & E FRONTAGE RD
Built 1973
Bridge Details
- Structure #
- 060000400000000
- Year Built
- 1939
- Reconstructed
- 2002
- Length
- 62.8 m (206 ft)
- Max Span
- 24.1 m
- Width
- 10.7 m (35.1 ft)
- Lanes
- 2
- Daily Traffic
- 150
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $469,000
- Total Project Cost
- $516,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.