TR 114B(RILEY RD) over FAP 322(US 51)
2 MI S OF ELWIN · County 115, Illinois · Built 1994 · 2 Lanes · 75 vehicles/day
Overall
Deck
8
Very Good
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
39.765761, -88.980439
This bridge is in worse condition than 34.1% of bridges in County 115. The average bridge in Illinois is 0 years old; this one is 32 years old.
Nearby Bridges
FAP 710(NB BS RT 5 over FAP 322(US 51)
Built 1994
FAS 552(CH 30) over FAP 322(US 51)
Built 1994
FAS 552 over MOSQUITO CREEK
Built 2013
FAP 322(SB) (US 51 over BS-51 & DECATUR CENTRALR
Built 1976
FAP 322(NB) (US 5 over BS-51 & DECATUR CENTRALR
Built 1976
FAP 322(SB) (US 5 over FAU 7426(TAYLOR RD)
Built 1976
FAP 322(NB) (US 5 over FAU 7426(TAYLOR RD)
Built 1976
FAP 322 (US 51) over SPRING CREEK
Built 1976
CH 30(FAU 7403) over SAND CREEK TRIB
Built 1986
TR 203(HERITAGE RD over WARD BRANCH
Built 1980
Bridge Details
- Structure #
- 058012300000000
- Year Built
- 1994
- Length
- 86.9 m (285.1 ft)
- Max Span
- 32 m
- Width
- 10.1 m (33.1 ft)
- Lanes
- 2
- Daily Traffic
- 75
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.