FAP 322 (US 51) over SPRING CREEK
S BETWEEN IL48&BSN51 · County 115, Illinois · Built 1976 · 4 Lanes · 4,400 vehicles/day
Overall
Culvert
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 5 | Fair |
Location
39.790217, -88.992358
This bridge is in worse condition than 57.8% of bridges in County 115. The average bridge in Illinois is 0 years old; this one is 50 years old.
Nearby Bridges
TR 203(HERITAGE RD over WARD BRANCH
Built 1980
FAP 322(NB) (US 5 over FAU 7426(TAYLOR RD)
Built 1976
FAP 322(SB) (US 5 over FAU 7426(TAYLOR RD)
Built 1976
FAS 552 over MOSQUITO CREEK
Built 2013
FAP 322(NB) (US 5 over BS-51 & DECATUR CENTRALR
Built 1976
FAP 322(SB) (US 51 over BS-51 & DECATUR CENTRALR
Built 1976
TAYLOR RD(FAU 7426 over MORRISONS CREEK
Built 1985
TAYLOR RD(FAU 7426 over MORRISONS CREEK
Built 1985
TAYLOR RD(FAU 7426 over MORRISONS CREEK
Built 1985
FAP 322(SB)(US 51) over IL-48 & NS RR
Built 1978
Bridge Details
- Structure #
- 058200400000000
- Year Built
- 1976
- Length
- 11.7 m (38.4 ft)
- Max Span
- 5.4 m
- Lanes
- 4
- Daily Traffic
- 4,400
- Material
- Concrete
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.