CH 30(FAU 7403) over SAND CREEK TRIB
1.5 MI E OF ELWIN · County 115, Illinois · Built 1986 · 2 Lanes · 4,550 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
4
Poor
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 4 | Poor |
| Substructure | 5 | Fair |
Location
39.777431, -88.948497
This bridge is in worse condition than 85.8% of bridges in County 115. The average bridge in Illinois is 0 years old; this one is 40 years old.
Nearby Bridges
FAS 552(CH 30) over FAP 322(US 51)
Built 1994
TR 148(WALMSLEY RD over SAND CREEK
Built 1966
CH 49(WALMSLEY RD) over SAND CREEK
Built 1909
CH 30 FAU 7403 over SAND CREEK
Built 1986
FAP 322(SB) (US 51 over BS-51 & DECATUR CENTRALR
Built 1976
FAP 322(NB) (US 5 over BS-51 & DECATUR CENTRALR
Built 1976
FAP 322(SB) (US 5 over FAU 7426(TAYLOR RD)
Built 1976
FAP 322(NB) (US 5 over FAU 7426(TAYLOR RD)
Built 1976
FAP 710(NB BS RT 5 over FAP 322(US 51)
Built 1994
TR 114B(RILEY RD) over FAP 322(US 51)
Built 1994
Bridge Details
- Structure #
- 058328200000000
- Year Built
- 1986
- Length
- 38.4 m (126 ft)
- Max Span
- 12.8 m
- Width
- 9.2 m (30.2 ft)
- Lanes
- 2
- Daily Traffic
- 4,550
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $363,000
- Total Project Cost
- $423,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.