CH 6 N21ST over COVEL CREEK

3 Mi. E. of Gr Ridge · County 099, Illinois · Built 2015 · 2 Lanes · 1,100 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
050361300000000
Year Built
2015
Length
20.1 m (65.9 ft)
Max Span
19 m
Width
10.7 m (35.1 ft)
Lanes
2
Daily Traffic
1,100
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.