TR 322 over COVEL CREEK

E 19TH N 2095 · County 099, Illinois · Built 2016 · 2 Lanes · 50 vehicles/day

Overall
Good
Culvert
8
Very Good

Bridge Details

Structure #
050362000000000
Year Built
2016
Length
9.8 m (32.2 ft)
Max Span
4.8 m
Lanes
2
Daily Traffic
50
Material
Concrete Continuous
Design
Culvert
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.