FAS268 B/CH15 over COVEL CREEK

E 22ND N 2215 · County 099, Illinois · Built 1955 · 2 Lanes · 950 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
050302300000000
Year Built
1955
Length
16.5 m (54.1 ft)
Max Span
7.9 m
Width
8.6 m (28.2 ft)
Lanes
2
Daily Traffic
950
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.