IL 120 WB over DES PLAINES RIVER

2.5 M W OF US 41 · County 097, Illinois · Built 1959 · 2 Lanes · 30,700 vehicles/day

Overall
Fair
Deck
9
Excellent
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
049004700000000
Year Built
1959
Reconstructed
2024
Length
54.7 m (179.5 ft)
Max Span
21 m
Width
11.3 m (37.1 ft)
Lanes
2
Daily Traffic
30,700
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$803,000
Total Project Cost
$1,205,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.