IL 120 EB over STREAM

0.1 M W OF IL 21 · County 097, Illinois · Built 1960 · 3 Lanes · 27,900 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
049004500000000
Year Built
1960
Reconstructed
2003
Length
9.3 m (30.5 ft)
Max Span
9.3 m
Width
19.9 m (65.3 ft)
Lanes
3
Daily Traffic
27,900
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$96,000
Total Project Cost
$144,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.