IL 120 WB over STREAM

0.1 M W OF IL 21 · County 097, Illinois · Built 1960 · 2 Lanes · 27,900 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
049004400000000
Year Built
1960
Length
9.6 m (31.5 ft)
Max Span
9.1 m
Width
12.9 m (42.3 ft)
Lanes
2
Daily Traffic
27,900
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$96,000
Total Project Cost
$144,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.