TR 151 over MINERAL CREEK

5 MI. W. OF GENESEO · County 073, Illinois · Built 1992 · 2 Lanes · 100 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Condition Ratings

ComponentRatingDescription
Deck 8 Very Good
Superstructure 8 Very Good
Substructure 8 Very Good

Location

41.428081, -90.257178

This bridge is in worse condition than 13.7% of bridges in County 073. The average bridge in Illinois is 0 years old; this one is 34 years old.

Nearby Bridges

Bridge Details

Structure #
037331600000000
Year Built
1992
Length
24.8 m (81.4 ft)
Max Span
24.1 m
Width
7.3 m (24 ft)
Lanes
2
Daily Traffic
100
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.