TR 122 over FAI 80

4.5 MI W OF GENESEO · County 073, Illinois · Built 1961 · 2 Lanes · 150 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
037010900000000
Year Built
1961
Length
68.5 m (224.7 ft)
Max Span
20.6 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
150
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$134,000
Total Project Cost
$161,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.