FAI 80 WB over MINERAL CREEK

2.9 MI E JCT I74 · County 073, Illinois · Built 1961 · 2 Lanes · 10,300 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
5
Fair
Superstructure
4
Poor
Substructure
6
Satisfactory

Bridge Details

Structure #
037010800000000
Year Built
1961
Length
46 m (150.9 ft)
Max Span
19.2 m
Width
10.9 m (35.8 ft)
Lanes
2
Daily Traffic
10,300
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$712,000
Total Project Cost
$1,068,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.